Disassembly and Transfer Operation of Marine Loading Arm No. 6 at the Port of Bahía Blanca

Dec 11, 2025 | News

Safe and Coordinated Operation in the Port Area

On December 10, a major operation was carried out for the Port Management Consortium of Bahía Blanca.

The disassembly of Marine Loading Arm No. 6 at Flammable Dock No. 2 was carried out, a task that required precise planning and coordination among the teams involved.

Once disassembled, the loading arm was transported by pontoon to Berth 5/6 at Puerto Galván, where it was later moved by land to the Flammable Dock premises to continue with the next planned stages of the process.

This operation, carried out in a safe, efficient, and controlled manner, reinforces our commitment to providing high-quality operational solutions within the port environment and to supporting our clients in every technical challenge required by the region’s maritime and logistics activities.

Almirante Brown 3774, Ing. White, Bahia Blanca, Bs. As., Argentina B8103FHN

Send your message