Spill Control Drill with Grupo Unipar and Central Termoeléctrica Guillermo Brown

Sep 10, 2025 | News

Committed to the Environment

As part of our contract under the PLANACON – National Contingency Plan with Grupo Unipar and Central Termoeléctrica Guillermo Brown, yesterday we carried out a spill control drill at Flammable Dock No. 3.

These actions are part of the regular prevention and environmental emergency response procedures, aimed at ensuring a rapid, coordinated, and safe response to potential incidents that could impact the aquatic environment.

During the drill, containment boom deployment maneuvers were carried out, along with coordination between work teams and verification of response times, all under the supervision of specialized technical personnel and competent authorities.

The drill featured the valuable participation of representatives from Grupo Unipar, Central Termoeléctrica Guillermo Brown, and the Argentine Naval Prefecture, who accompanied and evaluated the development of the activities.

At Lanchas del Sur S.A., we maintain a strong commitment to operational safety and environmental care. Through continuous training and real-life scenario drills, we strengthen our response capabilities, reinforcing our contribution to the National Contingency Plan (PLANACON) and to the joint work with companies and institutions that share our vision of sustainability and environmental responsibility.

Almirante Brown 3774, Ing. White, Bahia Blanca, Bs. As., Argentina B8103FHN

Send your message